+6019-722 6580
support@gw-rack.com
clear
Home
About Us
Products
Racking System
Automation
Plastic
Safety
Others
Testimonials
Contact Us
Home
About Us
Products
Testimonials
Contact Us
home
>
Products
>
Racking System
>
Superblock Racking System
Product Range
Racking System (16)
Automation (5)
Plastic (4)
Safety (11)
Others (12)
Superblock Racking System
Please enter valid quantity.
Whatsapp Us
Email Us
Share Now
Product Description
Superblock Racking System is a unique design for a warehousing storage solution. The column distance can be up to 5 meters for each of the column distance.
The loading of a mezzanine floor can range from 250 kg/m2 - 500 kg/m2 and will be designed by our project team to suit your requirements.
It is the ideal solution to maximize the space you have available. So instead of moving premises, you use the area above you instead – creating additional floor space from wasted space above your existing working areas.
When it comes to planning a suitable layout for your storage platform mezzanine floor requirements, our project team will maximize space utilization and ensure your design is both cost-effective and practical.
Frequently Asked Questions
1. Do I need to submit to the Urban Redevelopment Authority (URA)?
Superblock Racking System can be exempted from GFA as long as use for storage purposes only. The standalone modular system will not attach to the walls and can be dismantled easily and not require bolting to ground and wall or welding.
2. Do I need to submit to the Civil Defence force (SCDF)?
Yes, as long you can stand on the decking. Submission is required. You may request for waiver of submission if the platform is too small.
3. Do I need to submit the Building and Construction Authority (BCA)?
Yes, a Submission structural plan against your unit is required. to get the Notice of approval will take about 4 - 6 weeks before start installation. after completion of installation. Final “Permit to carry out the works” must be according to the submission plan. any change of design will be not accepted.
4. Do I need to inform the landlord if I want to install a mezzanine floor?
Most landlords will require you to inform them of any proposed works and will normally require confirmation that Building management’s approval, Gold Wind Engineering can provide specification design layouts plan for you if required.
5. Are your installers experience to build Mezzanine floors?
We have been installing mezzanine floors nationally for over 21 years and have considerable project experience.